POWERING OUR COMMUNITIES

A Milestone for Regional Infrastructure: The Central-Orana Renewable Energy Zone

April 24, 2026

The installation of the first transmission tower in the Central-Orana Renewable Energy Zone (REZ) represents a landmark moment in Australia’s transition toward a modernized energy grid. Located in the Mid-Western region of New South Wales, this milestone marks the physical beginning of what is widely considered the first coordinated large-scale renewable energy precinct in the country. As Australia moves away from coal-fired power, the Central-Orana REZ serves as a blueprint for how infrastructure, economic development, and community engagement can converge to reshape regional landscapes.

The Central-Orana REZ is designed to integrate at least 4.5 gigawatts of newly generated electricity into the National Electricity Market (NEM). This requires a sophisticated network of high-voltage transmission lines and substations to connect wind and solar farms to the existing grid. The installation of the first tower is more than a construction achievement; it is a signal to investors and stakeholders that the transition is gaining tangible momentum. By centralizing renewable energy generation, the REZ model reduces the overall footprint of transmission infrastructure while maximizing the efficiency of energy delivery to homes and industries across the state.

Power Lines

One of the most significant aspects of the Central-Orana REZ is its role as an economic engine for regional New South Wales. The project is estimated to support approximately 5,000 construction jobs over its development lifespan. These roles span a wide range of expertise, from civil engineering and electrical work to logistics and site management. Beyond direct employment, the project is designed to provide a substantial boost to local small-to-medium enterprises (SMEs). Construction of this magnitude requires a vast supply chain, including local hardware suppliers, equipment hire, catering services, and hospitality. By prioritizing local procurement, the project ensures that a significant portion of the capital investment remains within the Orana region, fostering a cycle of local reinvestment and skill development.

For the communities within the REZ—including towns like Dubbo, Dunedoo, and Mudgee—the project brings both opportunities and the necessity for careful management. The New South Wales Government and EnergyCo have committed to a community-first approach to minimize the disruption caused by large-scale construction. The project includes a dedicated Community Benefit Fund, which aims to deliver long-term legacy benefits. This funding is intended to support local infrastructure, healthcare, and education initiatives, ensuring that the benefits of the energy transition are felt by residents who live alongside the new infrastructure. Furthermore, the influx of workers and the demand for housing and services necessitate ongoing collaboration between project leads and local councils to ensure that community amenities are enhanced rather than strained.

The Central-Orana REZ is a pilot for the future of the Australian grid. While the technical challenges of integrating renewables are significant, the socio-economic impacts are equally vital. By creating 5,000 jobs and stimulating local businesses, the project seeks to prove that the path to Net Zero can also be a path to regional prosperity. As more towers rise across the landscape, the focus will remain on balancing the urgent need for energy security with the long-term well-being of the communities hosting these vital assets.

Share

Latest News

Remote Goldfields Town Set to Run on 80% Renewables

August 20, 2026
Critical advancements in off-grid power technology are delivering clean, reliable electricity to some of Australia’s most isolated communities. Under a new partnership between Horizon Power and Pacific Energy, the Goldfields town of Menzies will soon transition to a modern hybrid system capable of delivering up to 80% of its total electricity needs from renewable sources.

Vital Grid Upgrades Underway to Secure Regional Power

August 17, 2026
Construction teams have officially broken ground on a major infrastructure development designed to safeguard the electricity backbone of Central Queensland. The comprehensive project involves upgrading essential sections of the 132kV transmission network, a vital regional corridor that distributes power across diverse industrial zones and local communities. By replacing ageing infrastructure with modern, high-capacity components, this timely project represents a critical step forward in fortifying the statewide grid against severe weather and meeting rising electricity demands.

Murchs Corner Battery Project Receives Federal Approval

July 23, 2026
Victoria’s transition toward a more resilient power network has taken a significant stride forward with the federal environmental clearance of the Murchs Corner battery energy storage system.

How Marinus Link boosts the Energy Future for Tasmania and Victoria

June 20, 2026
A significant effort is underway to modernise the electricity grid and meet the nation’s growing demand for power. New energy pathways are essential to move electricity from where it is generated to the homes and businesses where it is needed most.

New South Wales & Australian Capital Territory

Transgrid (NSW or ACT)

Want to talk about the Hunter Central Coast Renewable Energy Zone? (NSW)

Want to talk about the Central-West Orana Renewable Energy Zone? (NSW)

Western Australia

Western Power (South West Region)

Horizon Power (North West Region)

Victoria

AusNet

Want to talk about the VNI West project?

South Australia

Electranet

Northern Territory

Power and Water Corporation

Tasmania

TasNetworks

Queensland

Powerlink